In fact, as early as the middle and late 1980s, weightlessness scales have been widely used in industrial production industries, and they are also attributed to rotary weighing and measurement verification machinery and equipment, and the static data of the weighing and Its dynamic weighing advantages have been integrated, and electronic belt scales and spiral scales have been gradually replaced. The basic principles of weightlessness scales are mainly reflected in the system software of all raw materials, but the key lies in the key damage to the quality of the control plan. If the weightlessness scale is relatively small in terms of net weight, then all the machinery and equipment will be in the weightless raw material mode, and the enterprise Both time and time are more limited, and it is not possible to perform all weighing and accurate measurement operations very well. When people start the weightlessness scale, the basic principle of the weightlessness scale is reflected in the feeding machinery and equipment. When the feeding machinery and equipment are completely entered into the measurement verification mode, the feeding operation can be temporarily terminated. At that time, the adjustment instrument panel of the measurement verification can display the weighing data very well, and according to the total flow set before, carry out the vibrating feeding of the feeder. In fact, the basic principles of weightlessness scales are areas that everyone cares about and must be mastered. However, because weightlessness scales are widely used, and weightlessness scales must be applied at many levels, people should master the basic principles of weightlessness scales. This is the case both in application and actual operation of machinery and equipment. In the basic principle of weightlessness scale, the whole process of raw materials and the different links such as feeding and dumping are all different in terms of regulations. Before starting raw materials, the vibrating feeder for feeding should be turned on. And use the control panel to perform measurement verification and inspection sampling on it. However, when all the net weight of the hopper material for measurement verification has reached the specification, the operation of all the feeders must be terminated. At this time, the control board starts to work on the net weight of the raw materials, as well as sampling and inspection. In the case of pouring, the control board must start the vibrating feeder, but at this moment, it is pouring. When the raw materials in the silo are to be unloaded, the control panel still must carry out inspection, measurement verification and sampling of the raw materials.
Contact Person: Miss Leung
Phone: +86-0760-22629231 / 22629215 / 22773075
E-Mail:kenwei@multiweigh.com.cn
WhatsApp: +86 18933374210
Add: No.34 Zhenlian Road, Fusha Town, Zhongshan City, Guangdong, China